UK manufacturing factory with solar panels on a pitched metal roof and engineers reviewing project plans

Factory Solar Business Case: Stress-Test Electricity Prices, Production Shifts and Export

A factory solar business case should still make sense when production patterns and electricity prices change. This practical guide explains how UK manufacturers can test that resilience before committing capital or signing a long-term agreement.

Why a factory solar forecast needs a stress test

A solar proposal can look attractive at a single electricity tariff and production schedule, but manufacturing operations change. A factory may add a weekend shift, reduce output, replace a production line or move to a different supply contract. Our half-hourly factory solar self-consumption guide explains how to match production demand against solar generation before applying financial assumptions. A credible investment decision should therefore show a range of outcomes rather than one headline payback figure. This guide focuses on financial sensitivity and decision-making; for the physical and electrical checks, start with our solar panels for factories guide.

Start with half-hourly consumption, not roof size

Obtain at least twelve months of half-hourly import data where available, including seasonal peaks, maintenance shutdowns, bank holidays and overnight baseload. Compare it with an hourly or half-hourly solar generation model for the proposed roof orientation, pitch, shading and location. Annual kWh divided by annual usage is not a self-consumption calculation: two equal annual totals may occur at entirely different times. Review our half-hourly electricity data guide before accepting an annual-only forecast.

Build three operating scenarios

Use a base case reflecting the current shift pattern, a downside case with lower daytime production and a higher-output case with additional daytime shifts. In each case, recalculate how much solar is used on site, how much is exported and whether any generation must be curtailed. A site running five days per week may export more at weekends than a seven-day operation. If production is seasonal, use monthly or half-hourly profiles rather than a flat percentage. Keep assumptions visible so finance and operations teams can challenge them.

Stress-test the electricity price

Do not treat the full invoiced electricity rate as the avoidable value of every solar-generated kWh. Separate import energy charges from standing charges, capacity-related charges, taxes and other contract components. The avoided unit cost can vary by time of day and contract structure. Model a low, central and high future import-price path, then show savings at each path. An illustrative model at 25p/kWh is not a promise that a factory will avoid 25p on every solar kWh. Confirm contract terms with the energy supplier and adviser.

Test export revenue and curtailment separately

Surplus power may earn an export tariff, but eligibility, metering, contractual terms and export permissions matter. Use a cautious export-rate assumption and include a zero-export sensitivity where appropriate. If the distribution network operator requires export limitation, the generation model should reflect curtailment rather than valuing electricity that cannot be used or sold. For technical background, see G100, zero-export and curtailment.

Include costs that can change the answer

Beyond panels and inverters, consider structural surveys, roof repairs, access equipment, switchgear modifications, DNO works, insurance requirements, monitoring, planned maintenance and inverter replacement. Do not assume every roof will last the full solar project term without refurbishment. Check the factory solar insurance documentation requirements before treating an assumed roof and insurance cost as final. If a roof replacement is likely during the project, compare installing solar after roof works with installing now and paying for removal and reinstatement later.

Compare buying, finance and a PPA on the same basis

An outright purchase, financed purchase and power purchase agreement allocate costs, ownership, risks and future savings differently. Compare them over the same horizon, with transparent inflation assumptions and an appropriate discount rate. For finance, include repayments, interest, fees and ownership of the equipment. For a PPA, examine contracted purchase price, escalation, minimum purchase obligations, roof access, end-of-term options and what happens if the building is sold. Read our PPA versus buying guide for the contractual differences.

Use a decision table, not a single payback number

Present at least three scenarios to directors: conservative, expected and favourable. For each, show installed cost or contractual commitment, generation, on-site use, export, annual net benefit, annual operating costs, financing obligations and discounted cash flow. Identify the assumptions with the greatest effect on the result. If a small change in self-consumption or grid price makes the proposal unattractive, that is a decision-relevant finding—not a reason to hide the sensitivity.

Questions finance directors should ask

Ask whether the generation forecast is independently evidenced; whether half-hourly consumption supports the assumed self-consumption; who carries DNO, roof and performance risks; whether the export arrangement is documented; and whether cash-flow projections include downtime, maintenance and financing. Check that projected carbon savings use a clearly stated methodology and do not count exported electricity as avoided purchased electricity for the factory.

Next step for UK manufacturers

A robust factory solar business case connects operations, finance, facilities and energy procurement. Start with a roof feasibility review and real electricity data, then request a sensitivity table that remains credible under changes to production and tariff assumptions. Commercial Solar Systems can help assess suitable UK factory and engineering roofs and explore purchase, finance or PPA routes. Contact us to discuss your factory site.

Factory Solar in Winter: How UK Manufacturers Should Budget for Seasonal Generation

UK engineering factory with rooftop solar panels, showing manufacturing operations and factory electricity demand

Factory Solar Self-Consumption: How UK Manufacturers Should Analyse Half-Hourly Demand

Categories:

Share :

Factory Solar in Winter: How UK Manufacturers Should Budget for Seasonal Generation

UK engineering factory with rooftop solar panels, showing manufacturing operations and factory electricity demand

Factory Solar Self-Consumption: How UK Manufacturers Should Analyse Half-Hourly Demand